MBARI ocean observing systems |
MOOS mooring and vertical profiler
Project Manager: Mark Chaffey
(a) Work in 2002 will include verifying the performance of the basic design
by monitoring the test mooring and proceeding with the detailed design of the
next deployment system. This second deployment will have the complete mooring
system in the low power configuration and be able to power benthic instruments,
and is currently scheduled for 2003.
(b) Efforts in 2002 will be directed toward the following
(i) Monitoring the test mooring performance.
- To verify the accuracy of the WHOI CABLE dynamics model used to predict
mooring riser cable configuration and cable loading.
- To test the design life of the cable terminations, bending/axial strain
relief’s, and other mechanical elements of the design.
- To verify our ability to perform the ROV operations necessary for
completing the connections between the riser cable and the seafloor mounted
instrumentation.
(ii) Completing the preliminary and detailed designs of the MOOS mooring
subsystems.
- Electrical power system.
- Mooring controller (extension of NMC).
- Integration with field test release of ISI.
- Local (intra-mooring system communications) design.
- Over-the-horizon communications design.
- Vertical profiler (concept design only)
- Modifications to the mechanical design based
on the results from the test
deployment.
(iii) Starting the fabricating of system #2. This mooring will include the
final low power version power system, completed intra-node communications
system and a data connection back to shore. The operating software will be an
initial release of ISI software with proof-of-concept applications drivers to
support the specific instrument suite specified in the target science
experiment.
(iv) Completing a literature search on development of Vertical Profilers
and undertaking a feasibility study to incorporate a vertical profiler into
the MOOS mooring system.
|